- Design-Bid-Build
This project consisted of the priming and painting of four large multi-story barracks including interior and exterior hazmat abatement. This was a fast-track project surpassing client schedule by three months. All barracks were entirely occupied during the construction. This required a large amount of cooperation and coordination for the project to be successful.