- Project Oversight
The project consisted of installing one ground mounted photo voltaic system array and a separate array system adhered roof top of an existing gymnasium to produce at least 200 KW of energy to supplement the existing supplies. The project entailed performing all construction activities during a period of a fully occupied middle school while performing trenching of electrical lines throughout the school and into the existing primary switch gear assemblies. The school expects immediate returns on their investment which is expected to assist during a period of funding challenges.