- Design-Bid-Build Construction & Engineering
Repair chilled piping leaks from 16 inch central plant main to building HVAC systems. This included over 200 feet of excavation, concrete deck demolition and depths of up to 15 feet to repair and install new piping and associated thrust blocks.