Login
Phone: (800) 983-1190

Repair Dive Tower


  • Demolition of 80 tons of concrete dive tower



 
Design-Bid-Build of new 20 ton 45 foot high dive tower. This included the demolition of existing 80 ton structure and foundation. The new tower installation included a new foundation tied into existing concrete caissons and new grounding system.